
Landed · Terrace · Semi-D · Bungalow
Full rewiring, new DB box, single- to 3-phase upgrade, EV charger point and A&A / reconstruction electrical works.
Full rewiring by a 1st Class EMA-licensed electrical contractor. In-house electricians, LEW-endorsed testing and a fixed, itemised price before any work starts.

Insulation breaks down, joints loosen and old DB boxes were never sized for aircon in every room, induction hobs and EV chargers. These are the warning signs we see most:

Every job is scoped on site and priced line by line. Typical ranges below so you can plan your budget.

Full rewiring, new DB box, single- to 3-phase upgrade, EV charger point and A&A / reconstruction electrical works.

Rewiring planned around your renovation, DB upgrade and lighting. We flag MCST approval needs at the assessment.

Commercial rewiring, switchboard works, fit-outs, temporary supply for site offices and power upgrades.
We check wiring condition, DB box, earthing and load requirements.
Full scope and price in writing before you commit. No hidden surcharges.
Our own electricians run new cabling and install the new DB, keeping disruption low.
Every circuit tested under load, LEW-endorsed where required, plus 90-day warranty.
No stock photos. These are MM Engineering projects across homes, offices and commercial sites.






Rewiring is not a job to hand to an unlicensed handyman. It can void your insurance and put your household at risk.
Answer 4 quick questions. Your details go straight to our team on WhatsApp and we reply with available site-visit slots.
Yes. We inspect your wiring, DB box and load requirements and send a written, itemised quote. There is no obligation to proceed.
It depends on size and access. Condo units typically take a few days; landed homes and commercial units are scheduled after the site survey, and we coordinate with your renovation timeline.
For occupied homes we work section by section and restore power each evening where possible. Many clients rewire during renovation to minimise disruption.
If the work touches a shared riser or needs hacking, most MCSTs want to approve it first. We tell you what’s likely needed after seeing your unit.
Yes. This is common for landed homes and is best planned together with the rewiring, so the DB and supply are sized correctly once.
Every circuit is tested under load before handover, with LEW endorsement where your scope requires it. We handle the EMA / SP Group notifications for DB or supply changes.
Get a fixed, itemised quote from a 1st Class EMA-licensed contractor, with a 90-day workmanship warranty on all rewiring works.